top of page

140 HR

Augmented Reality Sound Installation

The project looked at using technology to facilitate an auditory experience of the history of the building The building in his tenure has changed programs from being a workshop to an architecture school, now an abandoned building to a new railway station. The installation looks at reliving the memories of the building through an auditory experience. Google’s Project Tango Tablet was used to facilitate the experience. A walk in the empty space of the building brings back the memories of its past and this installation captures the past life of the building through the aspect of sound.        

 

Academic: Design Project 

Team: Yulia Marouda, Hesham Hattab

Binaural headphones along with the Tango tablet guided the user to an auditory experience of the space. 

bottom of page